Quick Sunday trip on the most sunny of days.
A look at the exit on the way to the entrance, it looked most interesting. Nigel was to rig this one but had a moment on the 1st traverse, Paul took over the rigging and did an excellent job through out. After the 2nd pitch a race along the meanders and a 10 minute crawl theough pleasantly small passage to exit in sunshine. Skeggy de rigged.
Time taken approx 2 hours
Nigel, Paul, Pete, Gordon, Rob and Skeggy
- - - - - - - - - - - - - - - - - -
peterj
Great trip, well worth doing when the water is low as the squeeze in fast high water won't be fun.
Thanks to all for rigging and de-rigging, might be worth doing an exchange sometime.
PJ.
- - - - - - - - - - - - - - - - - -
iball
The duck in fast high water after a pull through is a real pain.
First time I met Keith Mason was setting off to Heron. Long time ago, perhaps a decade ago now, doubt you remember that Keith?
Ian B.
- - - - - - - - - - - - - - - - - -
gordona
A big THANK YOU to all the riggers /de riggers! (I think that's everyone except me an' Pete?! LOL)
Good trip. Thought we were in for something different when Alex said it was an 'interesting' exit.
We had a look at the exit on the way up to the entrance. So we knew what to expect. - luckily there was hardly any water coming out at all!! - Phew!
Glad the exit only had 6" of pooled water in it. Stream really only 4"?
The only real tight bit(chest width) was the actual exit - which was out to daylight, so no worries even for me there!
Great day really enjoyed it... looking forward to the next one.
- - - - - - - - - - - - - - - - - -
13 April 2010 14:52 Keith Mason
Vaguely remember it Ian, twas a long time ago
- - - - - - - - - - - - - - - - - -
13 April 2010 17:33 Paul Geddes
bunny ears ![]()
- - - - - - - - - - - - - - - - - -
14 April 2010 16:45 Nigel Steel
Good man ![]()