Decided to have a trip to the NCC Shafts as Andy had never been there and it has got all the elements of caving that he loves to hate

Although we didn't do the shafts due to time constraints, we did bring some of the old gear out that was left from the rebolting project.

Trip time 4hrs

Ann Soulsby, Andy Mason, Keith Mason