After the Wednesday evening trip taking in the gear, we went back in on Sunday to do some bolting, after prussiking up on the old (scary) rigging, we first went along Cliffhanger Passage to have a look at the Sump. Then coming back to the first pitch we placed two resin anchors, these to be rigged at a later date. Then the traverse out to the big pitch and the pitch itself was rigged using through bolts, also rigged with one very airy "Y" hang. This also meant we were able to go back down on good rigging, also fetched the old rigging out as we came down, probably one more trip to tidy up and get the old gear out.

Trip time 7hrs

Lee Langdon, Lisa Wootton, Keith Mason