Carried the drill etc back in and put seven bolts in the next section before the actual NCC Shafts, still on resin bolts, so another trip needed to rig.
Trip time 3hrs15
Lee Langdon, Rob Dalby, Mel Smith, Alan, Keith Mason
Carried the drill etc back in and put seven bolts in the next section before the actual NCC Shafts, still on resin bolts, so another trip needed to rig.
Trip time 3hrs15
Lee Langdon, Rob Dalby, Mel Smith, Alan, Keith Mason