As this was the trip on the meets list for the AGM weekend, we thought that we had better do it.

James got the team packing bags and we ended up with string for SE route & Dolly Tubs, Greasy Slab (& the Alternative) and the Bridge route, with the traverse between the two routes and the final pitch into the bottom of Diccan. 

Ros volunteered to pop into the farm to pay and we all headed up to Alum Pot lane, where James discovered that he had forgotten his dry oversuit (and his wet one). Not to be put off he donned an extra layer and declared that it would be fine.

Josh, Paul and Dave headed for the Diccan entrance to go down the Dolly Tubs, to the Bridge and down. Josh rigged the Dolly Tubs & Greasy Slab. Dave rigged the Greasy Slab Alternative and the bridge and descent to the bottom. 

James led the other group (of nine) over the style near NW route and round the top of the pot to SE route. James quickly rigged the various pitches and descended to the bottom of Diccan where it was as wet as usual. 

Alex re-rigged the first pitch to remove a rub point above the first rebelay. Most of the remaining people then accessed the rope from a slightly lower ledge with tree routes, rather than fighting the tree at the top of the pitch. 

James was by now getting a little chilly, so he headed back up the bridge route and sat in the window keeping an eye on progress. Most of the team followed him out that way (with various levels of competence). 

Ros & Sally went back up the SE route followed by Paul & Dave. Having de-rigged the SE pitch Dave went back in via Diccan, where he had a word with a pair of girls who appeared to be heading for the pitches of Diccan, passing a group of children with instructors and meeting with James on the Dolly Tubs traverse. Most of the team had already left via the Long Churns. So James lead Phil, Mike & Dave up the Long Churns, leaving Josh & his friend to de-rig. 

Team: James, Josh, Josh's friend, Phil, Mike, Alex, Paul, Andy, Janis, Ros, Dave & Sally (BPC infiltrator). 

Time: Probably about 3 hours in total. 

 

- - - - - - - - - - - - - - - - - -

7 February 2023 22:41 Ian Ball

dchadwick: "

Dave went back in via Diccan, where he had a word with a pair of girls who appeared to be heading for the pitches of Diccan, passing a group of children with instructors and meeting with James on the Dolly Tubs traverse. 

 "

Jeepers! Diccan on Saturday would have been a snorkel job surely!