With the ground saturated and more rain forecast, we decided to save Little Hull for another day and do a couple of short trips on West Kingsdale. Jingling followed by Aquamole was the plan. 

We packed the ropes, changed and headed up to the parking spot. When we got to the cave, there was a group already in Jingling, so we moved straight onto Aquamole. 

Dave rigged the first bag of rope, the tail end of which was a little damper than normal. Ade & Long Bob overtook into the crawl with the next two bags (sufficient to get to the bottom of the main pitch). Janis (a new member) was next, closely followed by Paul with the rope for the alternative route. 

When we got to the top of the final pitch, Ade had already gone down with the plan to return quickly and then do the alternative route. 

Dave set off to rig the alternative route followed by Janis & eventually Ade, while Paul and Bob went down the normal route. 

The first pitch on the alternative route went okay, by Dave started rigging the traverse with the second rope, which was meant to be done without rope. This meant that the rope was about 6m short, so the trusty bit of tatt came out to extend the rope to the floor. Ade came down and finally Janis doing his first underground knot pass. 

When we got to the bottom, Bob was already on his way back up the main pitch, Paul was intending to go out that way too, but let Janis go first. 

Dave & Ade went back up the alternative route with Ade derigging. Ade & Janis headed straight out with one of the bags. Dave & Paul followed with another 2 bags while Bob brought up the rear derigging. 

It being a little cold on the surface, we decided to head straight to Inglesport rather than tackle the now vacant Jingling. 

Time: About 3 hours.

.