A good number of people had put their names on the list allowing us to do an exchange between Bar Pot & Stream Passage Pot. 

We divided into 2 teams: Sam, Bob, Paul, Phil & Claire went in via Bar; Rich, Stu, Adrian & Dave went in via Stream Passage. 

We walked straight to the Stream Passage Pot entrance and Rich set off rigging the first 3 pitches. Adrian took over for the final pitch and we were soon at the bottom of the pitches. 

We then walked through to Stream Chamber where we met the Bar pot team. They had made good time on bar pot and had come straight through the cave with a slight detour to visit main chamber. 

We made our way to main chamber, then had a quick look at mud hall. There was more calcite than I remembered, but it was quite a while since I had been there. 

We then returned to main chamber and headed out of Bar Pot, with a small amount of rock abuse at the head of the first pitch. Stu did the derigging. 

Time: about 4h 15m.

- - - - - - - - - - - - - - - - - -

4 November 2022 19:28 Ian Ball

Is that Bar Pot Stu is coming up, looks super smooth and tighter than I remember!

- - - - - - - - - - - - - - - - - -

6 November 2022 07:17 David Chadwick

That's correct. It was tighter than I remembered too.

- - - - - - - - - - - - - - - - - -

10 November 2022 10:02 Stuart Weston

Super smooth and tight, that's me!