A one hour walk in, 12 pitches to rig and derig plus 3 handlines making a total of 15 ropes (250m of rope in total) followed by another hours walk back to the car in the hail.  A grand day out for the youth section of the YSS.  It's a good trip with some fine decoration half way down.  At the bottom there's a small puddle in a tight rift which I'm told is the sump.  On the way out it started to become type 2 fun - I think a slightly larger team would have made it type 1 fun all the way.Team: Long Bob, Dave C, Paul M

- - - - - - - - - - - - - - - - - -

10 April 2022 12:33 David Chadwick

I thought it was type 2 fun all the way, possibly type 3 at the top of the second pitch on the way out.

Attached are a few photos mainly of the formations.

- - - - - - - - - - - - - - - - - -

13 April 2022 22:31 Ian Ball

Wow, I've never fancied that place.