(This story was written by Alex and Ales on a rainy Saturday afternoon in the YSS library. It's based on a true story.)
Although it's not a classic Friday evening trip, we didn't have much choice this time: the weather forecast was horrible for the forthcoming weekend. But where is a will there is a way. Some of us felt like we have to come back after the previous failure and finish this project off.
It was 7pm where we set off from YSS with 3 full tackle bags and two cars full of cavers. Namely 5. The weather was just wonderful with a light summer breeze and a great view on Morecombe bay which will be in a total contrast with Saturday. At around 7:30 we were stood at the entrance and while I started to rig the first bolt I realized...that we are probably going to fail before we even got started. I forgot to take crabs!!! Luckily Don had a spare set in his boot. So we could enjoy the wonderful views and the walk back down the hill to the car. Meanwile Alex, Shez and Mike set off with Alex rigging his favourite 2nd pitch with a few hangers we had. Soon after this incident we reassembled below the 3rd pitch.
A bit of head scratching was had, when Alex searched for the appropriate bolts, but these were soon found. He started rigging the 22m deep pitch with a 16m rope as he was given the wrong bag. After de-rigging what he had done he then re-rigged it with the right rope and descended the pitch and the pitch below with the same rope.
Upon arriving at the pitch head, I saw that the rope was anchored to a very "sound" rock in the rift above, that wobbled sligthly. This rope led onto another splendid shaft which dropped two pitches in one, the bottom of which Mike free-climbed. The eigth pitch was just around the corner which was a free climb.
A short narrow rift led to the 9th pitch, where an optional squeeze provides a bypass to the first few meters of the pitch, which was fun! A easy crawl (easy for NFTFH) led to the 10th pitch, which was a straigtforward descent down two pitches.
Another sound anchor was used for the 12th pitch (hand line climb). Once down this a short crawl leads to the sump. There was hardly any water in the system, the pitches would likely become very exciting if there was any major rainfall, such as the rain that was forcast for saturday. In summary it was an excellent SRT trip, not becoming of the nature of the blackbook at least when it is in dry conditions. The only thing remotely hard was the 2nd pitch in Large, which caused much fun trying to get the tackle sacks through.
The most disapointing thing on the trip was our arrival back to Helwith Bridge just at the moment when the pub closed at 1:30 am ![]()
Party: Alex, Ales, Shez, Don (BRCC), Mike (ULSA)
Trip time: 5:30
- - - - - - - - - - - - - - - - - -
7 June 2014 20:31 Ian Ball
haha, We once forgot the rigging kit for Juniper gulf. Glad it was a somewhat less eventful trip this time.
- - - - - - - - - - - - - - - - - -
8 June 2014 19:45 Ales
Ian, big thanks for the laminated descriptions. I'm glad we could read them until the very end this time ![]()
- - - - - - - - - - - - - - - - - -
14 June 2014 09:17 Keith Mason
Finally ticked it off eh Ales, nice one ![]()